The electrical loom ...
... is nearly complete ...
... the TV satellite dish has been positioned ...
... and the floorboards have arrived.
George, Pete and Stuart have discussed and agreed the siting of the batteries and calorifier within the engine bay and the routes of the various aerial cables - the wiring should be finished by tomorrow morning when the floorboards will be put in.
In the meantime we’ve ordered the shower enclosure and will order the batteries tomorrow so that they can be wired up before all the rest of the engine ‘gubbins’ go in.
No comments:
Post a Comment