Saturday, 30 November 2013

Build day 19

This morning at Lambon Boats ...

The bulkhead separating the engine bay from the cabin is welded in place ...
 … and just look at that grin on George’s face ...
… seeing those skin tanks and cross-feed pipe in situ!
From here George and I drove out to Hartlebury Common for a good walk with Molly in the bright sunshine … for some piccies click here.

Build Day 18

 The rear bulkhead is being lowered ...
… it separates the engine compartment from the interior of the boat.

Thursday, 28 November 2013

Build Day 17

 Rubbing strakes are appearing
 These protrusions are usually the first part of the boat to come into contact with anything else and so protect the hull from damage
 Seam welding continues
Access hatch to the bow thruster motor and battery.
We are amazed at the speed that the boat is being progressed … it is just 10 working days (which include 2 half-day Saturdays) since Still Rockin was 2 sheets of flat steel on the floor!

Wednesday, 27 November 2013

Build day 16

 We have a well deck! I can see us now, sitting on comfy chairs in the sunshine sharing a bottle of vino-collapso!
Underneath the deck will be a 177 gallon (786 ltr) fresh water tank, so we should never run out!
Ian is doing the long tedious job of seam welding - he loves it!